論文- 伊藤 健 -
表示方法: 表示形式: 表示順:
件数:30件
[2005]
1.A Crop Planning Problem with Fuzzy Random Profit Coefficients.[Fuzzy Optimization and Decision Making,4(1),(2005),51-69]Tasuku TOYONAGA, Takeshi ITOH, Hiroaki ISHII
2.農業生産計画における不確実性.[統計数理研究所共同研究リポート「最適化:モデリングとアルゴリズム18」,178,(2005),359-368]豊永亮, 片山明彦, 伊藤健, 石井博昭
3.Agrichemical Application Amount Programming Problem Designed for Reducing Residual Pesticides.[Asia Pacific Management Review,10(1),(2005),1-4]Takeshi ITOH, Hiroaki ISHII
4.One Machine Scheduling Problem with Fuzzy Random Due-Dates.[Fuzzy Optimization and Decision Making,4(1),(2005),71-78]Takeshi ITOH, Hiroaki ISHII
[2004]
5.Crop Planning Problem with Random Profit Coefficient.[Central European Journal of Operations Research,12(1),(2004),87-92]Takeshi ITOH, Hiroaki ISHII, Teruaki NANSEKI
[2003]
6.残留農薬削減のための農薬散布量決定問題.[神戸学院経済学論集 (神戸学院大学経済学会),35(1),(2003),17-26]伊藤健
7.A Model of Crop Planning under Uncertainty in Agricultural Management.[International Journal of Production Economics,81,(2003),555-558]Takeshi ITOH, Hiroaki ISHII, Teruaki NANSEKI
[2002]
8.農業経営におけるソフトな作付計画.[神戸学院経済学論集 (神戸学院大学経済学会),34(1),(2002),1-13]伊藤健
[2001]
9.Crop Planning Problem with Fuzzy Profit Coefficients.[The Proceedings of International Conference on Industrial Engineering and Production Management 2001,(2001)]Takeshi ITOH, Hiroaki ISHII
10.Fuzzy Crop Planning Problem Based on Possibility Measure.[Proceedings of the 10th IEEE International Conference on Fuzzy Systems,(2001),1227-1230]Takeshi ITOH, Hiroaki ISHII
[2000]
11.One Machine Scheduling Problem with Fuzzy Processing Time and Random Due-Date.[The Proceedings of 4th International Conference on Engineering Design and Automation,(2000),1094-1097]Takeshi ITOH, Hiroaki ISHII
12.Crop Planning Problem with Random Profit Coefficient.[Proceedings of the 3rd Czech-Japan Seminar on Data Analysis and Decision Making under Uncertainty,(2000),24-28]Takeshi ITOH, Hiroaki ISHII, Teruaki NANSEKI
[1999]
13.Fuzzy Due-Date Scheduling Problem with Fuzzy Processing Time.[International Transactions in Operational Research,6(6),(1999),639-647]Takeshi ITOH, Hiroaki ISHII
14.One Machine Scheduling Problem with Fuzzy Random Due-Date.[The Proceedings of 3rd International Conference on Engineering Design and Automation,(1999),284-286]Takeshi ITOH, Hiroaki ISHII
[1998]
15.ファジィネットワーク上の最短経路問題.[日本ファジィ学会誌,10(2),(1998),348-355]島田文彦, 石井博昭, 伊藤健
16.ファジィネットワーク上での最適化問題.[京都大学数理解析研究所講究録「決定理論とその関連分野」,1043,(1998),25-31]島田文彦, 石井博昭, 伊藤健
17.可能性測度を用いたファジィ・スケジューリング問題.[京都大学数理解析研究所講究録「決定理論とその関連分野」,1043,(1998),19-24]伊藤健, 石井博昭
[1997]
18.Fuzzy Two-Stage Problem by Possibility Measure.[Mathematica Japonica,46(2),(1997),279-288]Takeshi ITOH, Hiroaki ISHII
19.ファジィランダム変数とその応用.[京都大学数理解析研究所講究録「連続と離散の最適化数理」,981,(1997),95-103]片桐英樹, 石井博昭, 伊藤健
20.経路の存在性を考慮したファジィ最短経路問題.[京都大学数理解析研究所講究録「連続と離散の最適化数理」,981,(1997),104-113]伊藤健, 石井博昭
Page: [1] [2] [next]
戻るこのページのトップへ
copyright(c)2005 Tohoku University