論文- 今村 文彦 -
表示方法: 表示形式: 表示順:
件数:260件
[2016]
1.Uncertainty in tsunami wave heights and arrival times caused by the rupture velocity in the strike direction of large earthquakes.[Natural Hazards,80(3),(2016),1749-1782]Fukutani, Y., Suppasri, A. and Imamura, F.
10.1007/s11069-015-2030-1
[2015]
2.Rail Reconstruction in Miyako City, Japan: How Financial Policies and Government Frameworks Rooted in Rational Planning Influence Rail Reconstruction and Disaster Resiliency.[The Journal of the International Association for Asia Pacific Studies,6(2),(2015),50-63]David N. Nguyen, and Fumihiko Imamura
3.Storm Surge Mapping of Typhoon Haiyan and its Impact in Tanauan, Leyte, Philippines.[International Journal of Disaster Risk Reduction,13,(2015),207-214]Yi, J. C., Suppasri, A. Kure, S., Bricker, J. D., Mas, E., Quimpo, M. and Yasuda, M.
10.1016/j.ijdrr.2015.05.007
4.A decade after the 2004 Indian Ocean tsunami – The progress in disaster preparedness and future challenges in Indonesia, Sri Lanka, Thailand and the Maldives.[Pure and Applied Geophysics,172(12),(2015),3313-3341]Suppasri, A., Goto, K., Muhari, A., Ranasinghe, P., Riyaz, M., Affan, M., Mas, E., Yasuda, M. and Imamura, F.
10.1007/s00024-015-1134-6
5.Near-field tsunami inundation forecast using the parallel TUNAMI-N2 model: Application to the 2011 Tohoku-Oki earthquake combined with source inversions.[Geophysical Research Letters,,42(4),(2015),1083-1091]Yusuke Oishi, Fumihiko Imamura and Daisuke Sugawara
10.1002/2014GL062577
6.Numerical identification of tsunami boulders and estimation of local tsunami size at Ibaruma reef of Ishigaki Island, Japan..[Island Arc,(2015)]Watanabe, M., Goto, K., Imamura, F., Hongo, C.
10.1111/iar.12115
7.Eight personal characteristics associated with the power to live with disasters as indicated by survivors of the 2011 Great East Japan Earthquake Disaster.[PLOS ONE,10(7),(2015),e0130349-]Sugiura M, Sato S, Nouchi R, Honda A, Abe T, Muramoto T, Imamura F
10.1371/journal.pone.0130349
8.THE CHARACTERIZING MODEL FOR TSUNAMI SOURCE REGARDING THE INTER-PLATE EARTHQUAKE TSUNAMI.[Journal of Japan Association for Earthquake Engineering,15(3),(2015),114-133]Hideharu SUGINO, Yoko IWABUCHI, Norihiko HASHIMOTO, Kazuyuki MATSUSUE,Katsumi EBISAWA, Hiroyuki KAMEDA and Fumihiko IMAMURA
9.A Survey on the Audible Quality of Outdoor Public Address Speakers for the Disaster Reduction Broadcasting System in the Central Area of Ishinomaki City.[IEICE TRANSACTIONS on Fundamentals of Electronics, Communications and Computer Sciences,E98-A(8),(2015),1671-1673]Shosuke SATO, Masaharu NAKAGAWA, Masahiro IWASAKI, Fumihiko IMAMURA
10.Fragility curves based on data from the 2011 Great East Japan tsunami in Ishinomaki city with discussion of parameters influencing building damage.[Earthquake Spectra,31(2),(2015),841-868]Suppasri, A., Charvet, I., Imai, K. and Imamura, F.
11.Stochastic analysis and uncertainty assessment of tsunami wave height using a random source parameter model that targets a Tohoku-type earthquake fault.[Stochastic Environmental Research and Risk Assessment,31(2),(2015),1763-1779]Fukutani, Y., Suppasri, A. and Imamura, F.
10.1007/s00477-014-0966-4
12.Assessment of tsunami hazard in port and its impact on marine vessels from tsunami model and observed damage data.[Natural Hazards,,78(2),(2015),1309-1328]Muhari, A., Charvet, I., Futami, T., Suppasri, A. and Imamura, F.
10.1007/s11069-015-1772-0
13.A Study on Influential Factors on Building Damage in Kesennuma, Japan from the 2011 Great East Japan Tsunami.[Engineering Journal,,19(3),(2015),105-115]Leelawat, N., Suppasri, A., Charvet, I., Kimura, T., Sugawara, D., and Imamura, F.
14.Recent advances in agent-based tsunami evacuation simulations: Case studies in Indonesia, Thailand, Japan and Peru.[Pure and Applied Geophysics,172(12),(2015),3409-3424]Mas, E., Koshimura, S., Imamura, F., Suppasri, A., Muhari, A. and Adriano, B.
10.1007/s00024-015-1105-y
15.Disaster Recovery and Reconstruction following the 2011 Great East Japan Earthquake and Tsunami: A Business Process Management Perspective.[International Journal of Disaster Risk Science,6(3),(2015),310-314]Leelawat, N., Suppasri, A. and Imamura, F.
10.1007/s13753-015-0066-1
16.Disaster Warning System in the Philippines through Enterprise Engineering Perspective: A Study on the 2013 Super Typhoon Haiyan.[Journal of Disaster Research,,10(6),(2015),1041-1050]Leelawat, N., Suppasri, A., Kure, S., Yi, C. J., Mateo, C. M R. and Imamura, F.
17.中小規模の災害対応組織の活動過程に対する体 系的な記録手法の提案-東日本大震災における七ヶ浜町ボランティアセンターの災害対応を例にして-.[自然災害科学,34(3),(2015),225-241]佐藤翔輔,永村美奈,今村文彦
18.Fragility estimations for Kesennuma City following the 2011 Great East Japan Tsunami based on maximum flow depths, velocities and debris impact, with evaluation of the ordinal model's predictive accuracy.[Natural hazards,,79(3),(2015),2073-2099]Charvet, I., Suppasri, A., Kimura, H., Sugawara, D. and Imamura, F.
10.1007/s11069-015-1947-8
[2014]
19.プレート間地震による津波の特性化波源モデルの提案.[日本地震工学会論文集,14(5),(2014),1-5]杉野英治,岩渕洋子,橋本紀彦,松末和之,蛯澤勝三,亀田弘行,今村文彦
20.確率論的津波遡上評価と津波リスクの定量化.[土木学会論文集B2(海岸工学),70(2),(2014),1381-1385]福谷陽,Suppasri Anawat,安倍祥,今村文彦
Page: [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [next]
戻るこのページのトップへ
copyright(c)2005 Tohoku University